中文    English

Electrical Power

With over three decades of experience in the maintenance of power distribution infrastructures with EDF, the French state owned power company, and gas networks with GDF, the state gas supplier, Siveco has created one of the world’s strongest solution from a functional perspective. Due to its background with complex multisite projects, COSWIN 7i provides very flexible structures handling, based on latest IEC 81346 (or KKS) allowing a fast build-up of the technical database and ensuring it is always maintained up-to-date-which has proven to be a major concern for Chinese utilities that have implemented traditional EAM systems. From its experience in power networks, COSWIN 7i has inherited a unique constraint-based planning & scheduling system covers requirements for multi-year budgeting, simulation of different strategies, annual budgets, monthly planning and weekly/daily dispatching, as well as overhaul or project planning. Finally the standard DCS/SCADA/CBM interfaces available in COSWIN, providing not only a transfer of alarms, measurements and meters with real forecasting capability, but also full HMI integration, has proven to bring significant operational advantages.

Siveco works with power generators (coal, hydro, gas, renewables, nuclear), transmission and distribution companies all over the world, including:

EDF (France)
EDF Wind Power (France)
GDF-SUEZ (France)
Areva NP (France)
Ansaldo Energy (Italy)
Public Power Corporation (Greece)
Abener/Solucar (Spain)
Electricity of Lebanon
Electricity of Djibouti
Sonelgaz (Algeria)
PEDEE (Syria)
Mapna (Iran)
Zhuji Power Supply Bureau (China)
STEG (Tunisia)
SOGEX (Middle East)

沪ICP备08024864号